SOIL is Hiring: Seeking an EkoLakay Project Manager
SOIL is seeking a full time EkoLakay Project Manager to support the scale up of SOIL’s social business pilot for providing sustainable household sanitation in Port-au-Prince. We are looking for someone passionate about researching, designing, implementing, and improving social business models for the sustainable private-sector provision of ecological sanitation services.
Thank you for sharing this announcement widely and helping us find the right person to join our passionate and dynamic team!
POSITION DESCRIPTION
The full position description is on Idealist.org.
APPLICATION PROCESS
Interested applicants should submit a cover letter, CV, and three references to [email protected] no later than August 15, 2015.
Jean-Robert Charles
July 17, 2015 (5:40 pm)
Please contact me, for I may be of help.
Leah Page
July 18, 2015 (6:59 pm)
Thank you Jean-Robert! Please feel free to share this widely with your network and/or submit an application yourself! The full position description and application instructions are available at http://www.idealist.org/view/job/nT6kZ32fTX74.
Christopher Gatherum
August 13, 2015 (11:33 am)
I am a construction project manager looking for a position in Haiti.
Leah Page
August 13, 2015 (2:12 pm)
Thank you, Christopher. The full position description and application instructions are available at http://www.idealist.org/view/job/nT6kZ32fTX74. We are accepting applications through Saturday (August 15th).
Christopher Gatherum
October 13, 2016 (9:47 am)
I sent you a email before but to date I have not heard from you?
Mr CHRISTOPHER GATHERUM
Email –[email protected]
Number. 44 1455 440548 or Mobil 07707429939 Skype.chris.gatherum11
CONSTRUCTION PROJECT MANAGER / SITE MANAGER
AN OUTSTANDING AND DEDICATED ENGINEER (BSC) CONSTRUCTION ENGINEER
TRAINED IN THE UK I AM LOOKING FOR A POSITION IN AFRICA OR .ASIA,
HAVE 25 YEARS WORKING IN THIS INDUSTRY.
I have been doing freelance work in the UK.
KHARIS MEGA INVESTMETS LTD,ABUJA,NIGERIA.
Date 03-02-2013 to 01.10.2015
PROJECT MANAGER. I have just completed a contract in Nigeria on the 01-September 2015
This was for a construction company in Abuja Nigeria,. Building of 50 residential development in Gudu Abuja on a raft foundation., of three buildings five story high each. My duties were to liaise with the architects and clients and overseeing the project. I am looking for accommodation ,Mobil phone ,laptop, car, etc.
POWERFLEX,ZAMBIA, KITWE,ZAMBIA. GENERAL MANAGER. Date 07-01-11 to 08-02-13.
Direct control all departments of Power Flex, to establish all viable and profitable business i.e. construction, markets, etc. extensive knowledge of fixed and mobile plant crushers and batching plants on copper mine, and using coal power from crushing plant .and the complete generator work for all the machinery and building which are being used. Key Achievement.. Established effective cost control system resulting in a huge reduction in wastage and other inefficient practices. Outstanding negotiation skills resulted in driving profits.
BETON BAU,NIGERIA PVT LTD, LAGOS ,NIGERIA
STRUCTURAL CONSTRUCTION SPECIALIST Date 20-09-08 to 02-11-10..
Building of 12 store high rise and full control of the site, all health and safety matters on site, built on Rafts foundation,. Site meeting with architects and clients and overseeing construction of the structure ,and all the facilities power plants, water, sewer systems and water disposal units etc. Key Achievement To make sure project was on time and profitable.
SEABAY DEV.COY.LTD.
Lekki Phase 1 ,Victoria Island, Lagos . Contract Manager Date 01-02-08 to 05-07-08
Fabrication of jetty including all pilling structural steel work, liaising with architects, and clients.
Key Achievement. To make the Jetty was completed on time.
A.A. Recruitment, Birmingham. Contract Manager Date 03-04-06 to 28-01-08
The day to day running off all 6 building sites around the Birmingham area on high rises, sorting out drawings, all men on site, curtain walling, ordering all site materials, Key Achievement. Making sure that all sites were running properly.
Cogim, S,P,A Rottofreno, Piacenza , Italy.
Date 1st Sep 2005 to 02nd Jan 2007.
Contract Manager ARMY- CAMP IN –IRAQ )
The day to day running of the company site, company men and sub-contractors on site, running 3 generators 2 on 1 off, also liaising on site with architects and clients, clarifying drawings and office work including Microsoft, word and project. Key Achievement. Making sure that the project run to design.
Construction Kaiser Limited, Nigeria. SITE Manager Date I3th Oct 2001 to 10th Aug 2005
Duties included the day to day running of two sites (Banks) supervision of all men on site supervision of subcontractors on site, ordering all and chasing up all site materials, curtain walling, cladding, generation, liaising with the architect on site , word.2000.and excel, or micro soft project, and make sure all site rules and records are up to date . Key Achievement making sure that the project was to the Architect design.
HARARE CONSTRUCTION JOBING SERVICES ZIMBABWE. M/D Date January 1990 to Sep 2000
This was a company owed my me ( MD) which had 60 employees in it ,I was doing work for CALTEX Services Stations all over the country which included demolitions and re building the services stations all over the country from start to completion. This was building them and putting in the tanks etc. ,I was have site meeting with the Architects and make sure that the building was going to drawings , I run this company for about 10 years until I moved back to the UK. Quotations, Buying materials, Wages, and running the company by myself and making sure that the company made a profit. This was running a small building company of over 60 employees
International Construction Zimbabwe , Contact Manager. Date 1987 to 1989
Management and company workers as well as the sub- contractors on the site on High Rise building , plan and manage construction maintain site records, and to assist site quantity surveyor, cladding and curtain walling, generation, make sure all workmanship was to standards and to make sure the contract was profitable and completed on time. Word 2000 .Excel Key Achievement .
Making sure that high rises are completed on time.
Prestige Homes Harare, Zimbabwe .
Contact Manager Date 1983 to 1987
Contact Manager full control of running several housing and a flat sites and a very large shopping complex in Harare called SAM LEVYS VILLAGE , building. generation, roadways , drainage, curtain walling, cladding. Etc. Word 2000. Excel. Key Achievement. Making sure that Sam Levy was happy with the work done.
Cementation Pvt Ltd Harare , Zimbabwe.
Concrete General Foreman. Date 1980 to 1983
Complete running of construction site, raising up dam wall as well as raising intake tower and install new intake pipes and new valves in the pumping stations, generation, etc., managing all the staff on site all well as the sub-contractors on site, and also the running of batching plant.
Key Achievement. Making sure the Dam wall was up and all pumping stations running.
RHODESIA corps of Engineers Date 1980 to 1976 Bomb disposal unit, light infantry.
Bristish corps of Engineers. Date 1976 to 1964
Solider 3 Para unit. Bomb disposal unit, light infantry .building bailey bridges.
Education and Qualifications. Loughton boys school ,Loughton Essex.
Degree of Civil Engineering BSc Oxford 15th July 1976.Courses Microsoft Word, Project Management.
HGV LICENCE HOLD FULL DRIVEING LICENCE
Leah Page
October 13, 2016 (12:37 pm)
Dear Christopher, Thank you for checking in. This position opening has long since closed, but we are currently reviewing applications for a similar position (see: https://www.oursoil.org/job-opening-ekolakay-program-advisor/). If you submitted an application for this newer posting, we’ll be in touch within a month with the final note. I have also added you to our recruitment list so you will receive notifications of future openings at SOIL. Thank you for your interest in our organization, Leah